| Key facts | |
|---|---|
| Tool | Product Import (PI) |
| File types | Trade Service PFMS, fixed length, delimited or CSV, custom |
| Multiplier | PI Price Cost Multiplier Setup; 1.00000 means none |
| Future-dated costs | Yes: Days to Allow Forward, or PD Future Price/Cost Change Setup |
| Review | PI Entry Edit File, before products change |
Infor CloudSuite Distribution (CSD) was formerly SX.e. Most pages read were the SX.e 2021 documentation; the current CSD page on future price and cost changes matches it.
Which Infor CSD tool loads a supplier price file?
Product Import (PI). Infor describes it as a way to import updated pricing and product information from supplier or Trade Service files (Infor documentation). It is a set of functions:
- PI Import Definition Setup, which maps the supplier's file layout
- PI Price Cost Multiplier Setup
- PI New Product Default Setup
- PI Administrator Import File
- PI Entry Edit File, where imported records are reviewed
- PI Entry Update Products, which changes the product records
A separate tool, PD Mass Maintenance with Import Excel with New Records, loads sell-side price and discount records rather than supplier costs (Infor documentation).
Which file formats and multipliers does PI handle?
PI reads Trade Service PFMS, fixed-length, delimited or CSV, and custom files, from the import directory set in SA Administrator Options. When a supplier sends list prices, PI Price Cost Multiplier Setup calculates costs from them (Infor documentation):
| Field | What it does |
|---|---|
| Calculation Method | Incoming List Price |
| Calculation Order | Base Price, List Price, Replacement Cost, Standing Cost, Last Foreign Cost, Foreign Replacement Cost |
| Multiplier | 1.00000 means no multiplier |
| Rounding Method | Nearest, Up or Down |
| Rounding Target | The rounding unit |
Can you load a future-dated cost in Infor CSD?
Yes, two ways. PI selects records whose effective date is on or before today unless Days to Allow Forward is set (Infor documentation). And PD Future Price/Cost Change Setup holds future changes as a batch with an Effective Date; running the PD Administrator Future Price/Costs Report on or after that date updates the price and cost fields, and the report is the audit trail of what changed (Infor documentation).
What has to be set up first?
- A PI Import Definition for the supplier's layout, and a multiplier setup if the file carries list prices
- A check of cost-posting settings: standard or replacement cost is not updated when Allow Changing of GL Costs is Yes in SA Operator Setup-Controls and Post to G/L By is Standard or Replacement in SA Administrator Options
What goes wrong?
- A cost change that affects inventory valuation opens a journal to post the adjustment to the general ledger
- On the PD Excel import, region data can be included but is not supported, and errors appear in a message window to fix in the spreadsheet before re-importing
- A supplier file whose layout changed since the import definition was built
- Codes damaged when the file passed through Excel: Excel removes leading zeros from UPCs and part numbers and shows numbers of 12 or more digits in scientific notation unless the column is text (Microsoft Support)
How do you check a file before products change?
The PI Entry Edit File can be reviewed and edited before any product record changes, and PI prints reports including the PI Entry Journal Print and PI Entry Report From Update File (Infor documentation).
What does Price File Desk send back for Infor CSD?
A delimited file in the layout your PI Import Definition expects, with costs or list prices as your multiplier setup needs them. Only the items you stock are in it, every cost is in your stocking unit, and rows that need a decision go on a separate exceptions list. Your staff run the import; we never log in. See the sample output.
Guides for other ERPs: Prophet 21, NetSuite, Acumatica, Business Central, Sage 100.
Common questions
How do I import a supplier price file into Infor CSD?
Use Product Import (PI): map the layout in PI Import Definition Setup, import the file, review the PI Entry Edit File, then run PI Entry Update Products.
Can Infor CSD apply a supplier's list-price multiplier?
Yes. PI Price Cost Multiplier Setup calculates from Incoming List Price with a multiplier, where 1.00000 means none, and a rounding method.
Can Infor CSD hold a cost change until January 1?
Yes. PD Future Price/Cost Change Setup holds changes with an Effective Date, applied when the future price/costs report runs on or after that date.
First supplier file free. Pilot $500 for up to 5 files. Then $950 a month for up to 15 files, $60 per extra file. Every file back within 24 hours, or it is free.
Send your first file