| Key facts | |
|---|---|
| Tool | Visual Integrator, Import Job Maintenance |
| File | CSV, File Type Delimited |
| No-file option | Automatic Cost and Price Change |
| Future-dated costs | Not documented |
| Standard cost items | Standard Cost Adjustment Entry, not Visual Integrator |
Which Sage 100 tool loads supplier costs?
Visual Integrator. An import job, set up in Import Job Maintenance, reads a file into a table you choose (Sage 100 help). For a flat change with no file, Inventory Management's Automatic Cost and Price Change updates standard price, retail price and standard cost for ranges of items, product lines, price codes or primary vendors (Sage 100 help).
How should the file be prepared?
Save the spreadsheet as a CSV, set File Type to Delimited, and enter a comma as the delimiter. Sage warns that .xls and .wks files may not save properly and can read 0 records (Sage 100 help). ODBC is also a source type.
On the item, vendor data sits in Item Vendors Maintenance: Vendor No., the primary vendor flag, Vendor Item Code, Last Cost and Lead Time. Last Cost can only be viewed there (Sage 100 help).
What has to be set up first?
- A Visual Integrator job for each supplier layout, usually built once by a reseller or a power user and rerun by staff
- For items valued at standard cost: Sage says not to use Visual Integrator to change standard cost, and to use Standard Cost Adjustment Entry instead
Sage 100 help on standard cost adjustments
Can you load a future-dated cost in Sage 100?
We found no Sage 100 help page that supports an effective date for vendor cost. Plan to run the import on or just before the supplier's effective date.
What goes wrong?
- Fields shown in magenta cannot be validated during a test import
- Data longer than the field length is cut unless Skip Source Data Truncation is selected
- Excel files imported directly instead of saved as CSV, which can read 0 records
- Vendor item codes damaged when the CSV was saved from Excel: Excel removes leading zeros from UPCs and part numbers and shows numbers of 12 or more digits in scientific notation unless the column is text (Microsoft Support)
- Users report that quantity-break imports into price levels need 99,999,999 as the top break, or Sage can add a final break with no price
Sage 100 help on Import Job Maintenance fields
How do you check a file before it changes costs?
Visual Integrator has a test import mode; it does not check the fields shown in magenta (Sage 100 help). Run the test import on every new supplier layout, and spot-check a few items' costs after the real one.
What does Price File Desk send back for Sage 100?
A CSV in your Visual Integrator job's layout. We confirm the layout with you before you pay. Only the items you stock are in it, every cost is in your stocking unit, and rows that need a decision go on a separate exceptions list. Your staff run the import; we never log in. See the sample output.
Guides for other ERPs: Prophet 21, NetSuite, Acumatica, Infor CSD, Business Central.
Common questions
How do I import vendor costs into Sage 100?
With a Visual Integrator import job: save the supplier file as CSV, set File Type to Delimited with a comma, map it to the item tables and run a test import first.
Can Visual Integrator change standard cost?
Sage says not to use Visual Integrator to change standard cost for standard cost items; use Standard Cost Adjustment Entry.
Is there a way to raise costs for one vendor without a file?
Yes. Automatic Cost and Price Change updates cost and prices by primary vendor, product line, price code or item range.
First supplier file free. Pilot $500 for up to 5 files. Then $950 a month for up to 15 files, $60 per extra file. Every file back within 24 hours, or it is free.
Send your first file